Politici de confidentialitate
• DC insulation resistance with test voltages up to 1000V• PE conductor continuity test• Loop and Line impedance also without RCD triggering• RCD test• Illumination• Phase sequence in 3-phase systems• Measurements on earthling and lightning systems with included 2-clamp method (without junctions disassembling).• Electrical power and consumption measurement,• current and voltage harmonics measurement,• phase angle
• Measurement of step voltage and contact voltage.• Measurement of earthing resistance with resolution of 1 m?.• Measurement of specific earth resistance.• High current of up to 50 A and effective suppression of noise• Excellent immunity even against changing earth currents.• Autonomous Step Voltage meter: no need for long voltage leads.• Downloads test results directly to the PC with the help of the professional PC SW package HVLink
• Voltage testing up to 1000 V• Automatic AC/DC recognition• Continuity testing up to 2000 ?• Phase & Rotating Field Test RCD fault test• Diode Test• Auto Power Off• Data Hold• LCD display with backlight
• Voltage testing up to 1000 V• Automatic AC/DC recognition• Continuity buzzer and led to indicate resistances below 500 k?• Phase & Rotating Field Test• RCD trip testing• Diode Test• Auto Power Off
• Functional and visual inspection;• Earth bond resistance;• Insulation resistance;• Substitute leakage current;• Differential leakage current test;• Touch leakage test;• IEC cord polarity test;
• 12 V … 1000 V AC measurement range• Optical and vibrating indication• CAT III / 1000 V overvoltage protection
• 110 V … 1000 V AC measurement range• CAT III / 1000 V overvoltage protection• visual display indicator
• Continuity test with 200 mA.• Insulation resistance.• Insulation resistance of isolated accessible conductive parts.• Substitute leakage current.• Substitute leakage current of isolated. accessible conductive parts.• IEC cord polarity test.• Voltage.• Functional and visual inspection.
• Functional and visual inspection• Earth bond resistance• Insulation resistance• Insulation resistance of isolated accessible conductive parts• Substitute leakage current• Substitute leakage current of isolated accessible conductive parts• Differential leakage current test• Touch leakage test• PRCD test
• Earth bond / continuity resistance (200 mA)• Insulation resistance• Insulation resistance of isolated accessible conductive parts• Substitute leakage current• Substitute leakage current of isolated accessible conductive parts• Differential leakage current• Touch leakage current• IEC cord polarity test
• Earth bond / continuity resistance (200 mA, 10 A)• Insulation resistance• Insulation resistance of isolated accessible conductive parts• Substitute leakage current• Substitute leakage current of isolated accessible conductive parts• Differential leakage current• Touch leakage current• IEC cord polarity test
• Continuity tests (200 mA, 4 A, 10 A, 25 A).• Insulation resistance.• Substitute leakage current.• Differential leakage current.• Touch leakage current.• IEC cord polarity test.• Leakage and load TRMS current measurement with current clamp.
• All tests on 3-phase electrical equipment can be carried out, including live leakage test, power, polarity, RCD and Active polarity.• Simple connection to the PAT/MACHINE tester with automatic detection.• Simple test procedures, identical to single phase equipment.• Test sequence for 3-phase tests are automatically set, based on entered test codes and input voltages.
• Testing of single and 3-phase ARC Welding equipment.• Professional 3-phase portable appliance testing.• Professional 3-phase machine testing• Testing of Open-Circuit Voltage at ARC Welding Units in accordance to EN 60974-4.• All tests on 3-phase electrical equipment can be carried out including live leakage test, power, polarity, RCD and Active polarity.• Simple connection to the PAT/MACHINE tester with automatic detection
• High precision line impedance;• High precision fault loop impedance;• Contact voltage.• Range widening: adapts the instruments to read from 0.1 m? up to 19.99 ?.• Multi-system testing: works on both single phase and 3-phase systems (110 V to 440 V).
• Field proven instrument for under-wall low voltage installation tracing• fuse finding• short-circuit spot determination and metal installation tracing• Can be used on energized or voltage-free systems.• Tips and detailed descriptions of connection schemes for various combinations from everyday practice.
• Wiring check• DC insulation resistance• Continuity test• Line and Loop resistance• RCD test• Phase sequence• Pass/Fail visual and audio presentation of results
• Loop impedance / prospective fault current• Line impedance / prospective short-circuit current• Built-in fuse characteristics for quick evaluation of measuring results• RCD tests (trip out time, contact voltage, ramp test, Autotest)• Testing on 1- and 3-phase systems• Phase sequence test
• TRMS voltage and frequency• Continuity• Insulation resistance• RCD testing (type AC and A)• Fault loop / RCD Trip Lock impedance• Line impedance• Phase sequence