Descriere
3M™ Particulate Air Quality Monitor Kit 1 kit/cs
3M ID 70071580164 UPC# 00051131486072 3M Product Number EVM-3
The EVM-3 provides real-time direct reading of particulate mass concentrations along with temperature and relative humidity measurements. The proprietary dial-in impactors allow for quick selection of particulate settings PM2.5, PM4, PM10 or TSP (within the instrument`s measurement range) without disassembly.
Benefits
A built-in air sampling pump assists in the collection of particulates while the laser photometer provides real-time measurement. A standard 25 or 37 mm gravimetric cassette can be utilized for sampling and laboratory analysis and help provide correlation for real-time direct reading measurements.
Specifications
|
Battery Life |
8 hours |
|
Data Logging |
User Selectable Intervals |
|
Measurement Parameters |
Level, Min, Max, Avg, STEL, TWA |
|
Net Weight |
18 Ounce |
|
Power Source |
Lithium-Ion |
|
Product Type |
Particulate Monitor |
|
Sensors Available |
Included Sensors: Relative Humidity, Temperature, Particulates Available Sensors: CO, CO2, O2, H2 |
|
Standards/Approvals |
CE, RoHS |
Accesorii standard
The EVM 3 includes
Optiuni recomandate
3M™EVM 7 Environmental Monitor Kit, with CO, CO2, and PID Sensors 1 kit/cs
3M™EVM 7 Advanced Particulate and Air Quality Monitor Kit 1 kit/cs
3M™ EVM 4/CO Indoor Air Quality Monitor Kit, with CO Sensor 1 kit/cs
3M™ EVM 4 Indoor Air Quality Monitor Kit 1 kit/cs
3M™ EVM 3 Particulate Air Quality Monitor Kit 1 kit/cs
Alte produse 3M QUEST
|
SONOMETRU 3M SOUND EXAMINER SE-402
• Certified. |
|
TESTER MONITORIZARE STRES TERMIC CALDURA, GLOB NEGRU, INDICE CONFORT WBGT, AER UMED-USCAT 3M QUESTEMP
• high quality heat stress monitoring within the hassle of wet-bulb maintenance |
|
SONOMETRU 3M SOUNDPRO SP-SE-2-AC3
• Sunt în conformitate cu prevederile standardelor ANSI si IEC |
|
TESTER DETECTIE NIVEL ZGOMOT SIGURANTA LA LOCUL DE MUNCA 3M™ NOISEPRO 5NP-DLX-AC3
• personal noise dosimeters |
|
SIMULATOR BIO-ACUSTIC SIMULARE NIVEL VERIFICARE AUDIOMETRICA 3M BA-202
• Performs quick, easy audiometer testing to help ensure accurate patient assessments |
|
SONOMETRU 3M SOUNDPRO SP-DL-1-1/3-AC3
• Sunt în conformitate cu prevederile standardelor ANSI si IEC |
|
SONOMETRU 3M SOUNDPRO SP-SE-2-1/1
• Sunt în conformitate cu prevederile standardelor ANSI si IEC |
|
DOZIMETRU ZGOMOT 3M EG4-D
• Edge EG4 personal noise dosimeter offers advanced technology |
|
SONOMETRU 3M SOUNDPRO SP-SE-2-1/1-AC3
• Sunt în conformitate cu prevederile standardelor ANSI si IEC |
|
DOZIMETRU PERSONAL 3M NOISEPRO NP-DL-CBL
• personal noise dosimeters |